节点文献
行政决策的不可行性研究——以三门峡水利枢纽工程的决策过程为例
On the Non-feasibility of Administrative Decision-making——A Case Study of Sanmenxia Water Control Project
【摘要】 三门峡水利枢纽工程从修建到运行,经历了几十年的决策过程,期间由于某些决策的失误不仅造成了资源的浪费,也给黄河沿岸带来了不利的影响。造成行政决策失误的原因是多方面的,行政决策可行性论证的片面化和媚权化与行政决策不可行性论证的缺失是造成行政决策失误的最主要原因。因此,加强行政决策的不可行性研究是减少行政决策失误的重要手段。
【Abstract】 From the construction period to the operation, Sanmenxia Water Control Project has gone through decades of years on decision-making. And owing to some mistakes in decision making, it not only results to the waste of resources, but also brings some disadvantages on both sides of Yellow River. The reasons that lead in the wrong administrative decision-making are various, and among all the reasons, the one-sided and flaw on power of the feasibility demonstration are the most serious on administrative decision-making. So, strengthening the study of non-feasibility demonstration is the important approach to avoid the fault in administrative decision-making.
【Key words】 administrative decision-making; non-feasibility; Sanmenxia; policy demonstration;
- 【文献出处】 广西职业技术学院学报 ,Journal of Guangxi Vocational and Technical College , 编辑部邮箱 ,2016年02期
- 【分类号】C934
- 【下载频次】34